Skip to product information
Women's Curved Basketball Shoes With Thick Soles
$96.04
Complete with eyelets and a lace up closure for a classic look
- The upper is made of leather and the sole is made of Rubber
- Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
- Season: Autumn, Spring, Summer, Winter
- Occasion: Outdoor, Sports
- Gender: Women
- Care Instruction: Spot clean only

| EUR Size | US Size | Insole Length(inch) | Insole Length(mm) |
| 35 | 5 | 8.9 | 225 |
| 36 | 6 | 9.1 | 231 |
| 37 | 7 | 9.4 | 238 |
| 38 | 7.5 | 9.6 | 244 |
| 39 | 8 | 9.9 | 251 |
| 40 | 9 | 10.2 | 259 |
| 41 | 10 | 10.5 | 266 |
| 42 | 11 | 10.6 | 270 |
| 43 | 12 | 10.9 | 278 |
Product measurements may vary by up to 3~5mm