ADS-3SWSHD05-P96W1-FFFFFF

Women's Curved Basketball Shoes With Thick Soles

White / US5(EUR35)
$96.04
Skip to product information
ADS-3SWSHD05-P96W1-FFFFFF

Women's Curved Basketball Shoes With Thick Soles

$96.04
ColorWhite
Shoe size

Complete with eyelets and a lace up closure for a classic look

  • The upper is made of leather and the sole is made of Rubber
  • Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Women
  • Care Instruction: Spot clean only

EUR Size US Size Insole Length(inch) Insole Length(mm)
35 5 8.9 225
36 6 9.1 231
37 7 9.4 238
38 7.5 9.6 244
39 8 9.9 251
40 9 10.2 259
41 10 10.5 266
42 11 10.6 270
43 12 10.9 278

 

Product measurements may vary by up to 3~5mm

You may also like